Building Our 2nd Century: Renovations Referendum

separating rule

referendum logo

Architects' drawings showing locations of projects in the Renovations Referendum
 

Architects' renderings for each school are shown below. Many projects are for across-the-board improvements that can't be represented in these drawings, such as replacing the oldest and most deteriorated sections of roofing, installing more electrical outlets in classrooms, and updating fire alarm systems. For a complete list, go to Referendum Project List.

 

BH-BL High School

  • High School Floor Plan showing location of all projects within the building.  Classroom upgrades are also scheduled throughout the school NOTE: The STEAM addition is on the right, outlined in black, along the front of the school. The hallway into this addition would extend out from the enlarged auditorium foyer.
  • HS first floor archectural drawing

 

  • STEAM Addition, 1st floor
  • HS STEAM addition schematic

 

  • STEAM Addition, 2nd floor
  • HS STEAM addition first floor schematic
  • STEAM Addition, external view from the southwest corner

 

  • Aerial View of High School Building & Athletic Fields  Additions to the building are shown in purple. The artificial turf field would replace and be slightly wider than the existing football field. This multi-purpose field would be large enough for four sports and would be striped for all four: soccer, field hockey, football and lacrosse.
  • HS Site plan overall proposal schematic


O'Rourke Middle School

  • Aerial View of Middle School Projects   A security vestibule by the main front entrance is the only new construction proposed for this building.  In addition to classroom upgrades throughout the school, several science labs would receive major renovations, and the traffic pattern / parking would be redesigned to add parking spaces and improve students safety.
  • MS site plan schematic

 

Charlton Heights Elementary School

  • Aerial View of Charlton Heights Projects  In addition to classroom upgrades throughout the school, Charlton Heights would see construction of a new workroom/small group learning space and renovation of its gym.
  • Charlton Heights site plan schematic

 

Pashley Elementary School

  • Aerial View of Pashley Projects  In addition to classroom upgrades throughout the school, Pashley would see construction of a new workroom/small group learning space, renovation of its gym, replacement of deteriorated windowsills, and paving work.
  • Pashley site plan schematic

 

Stevens Elementary School

  • Aerial View of Stevens Projects  In addition to classroom upgrades throughout the school, Stevens would see renovation of its gym and a portion of its library. The main offices would be reconfigured to improve security procedures at the school's main entrance. The original, now deteriorated, garage west of the school would be torn down for more parking, and a new short-term parking, student drop-off loop would be constructed east of the school.
  • Stevens site plan schematic


 