shortcut
BH-BL Logo
Apr 27, 2017
Charlton Heights Elementary SchoolPashley Elementary SchoolStevens Elementary SchoolO'Rourke Middle SchoolBH-BL High School

Building Our 2nd Century: Renovations Referendum

separating rule

referendum logo

Timeline for project completion
 

Phase 1a

O'Rourke Middle School--Completed summer 2014

 

BH-BL High School--Completed in 2015

  • Renovating high school track & lighting, installing multi-purpose turf field. Work began fall 2014; estimated completion is summer 2015. To date, the old football field lights have been taken down and dismantled. In the spring, contractors will remove the old track and field and begin preparation for the new track and multi-purpose turf field.

  • Replacing classroom door locksets & closers at high school. Estimated completion is late winter 2015.

  • Construct storage building at high school. Work began in fall 2014 with an anticipated completion of spring 2015.

 

Phase 1b

Stevens Elementary School--Completed in 2015

  • Reconstructed Stevens main office, added a secure entrance vestibule. Work completed in winter 2015.

  • Demolished original Stevens garage. Work completed in winter 2015.

  • Restructure Stevens traffic area & construct separate parking for parents/staff. Anticipated completion spring/summer 2015

  • Restructure the parking area on the west side of the school building. Anticipated completion spring/summer 2015

 

Phase 2a

Pashley Elementary School-Completed in 2015

  • Repave Pashley entrance & parking lot
  • Reconstruct/replace deteriorated window sills
  • Roofing: replace oldest & deteriorated areas

 

Phase 2b

Pashley Elementary School-Completed in 2016

  • Addition of workroom/small group learning space
  • 21st Century classroom updates/Infrastructure improvements
  • Replace/install fire alarm systems
  • Improve classroom electrical access, install more outlets
  • Replace master clock & public address systems
  • Replace classroom asbestos floor tiles

 

Charlton Heights Elementary School--Completed in 2016

  • 21st Century classroom updates/Infrastructure improvements
  • Replace/install fire alarm systems
  • Improve classroom electrical access, install more outlets
  • Replace master clock & public address systems
  • Replace classroom asbestos floor tiles
  • Renovate the gymnasium
  • Addition of workroom/small group learning space

 

BH-BL High School--Construction began in the summer of 2016 and is expected to be complete in the 2017-18 school year

  • High School STEAM addition and relocation of District Offices. Note: STEAM = Science, Technology, Engineering, Arts and Math. This project includes the cost of moving the district offices into the space currently used for high school English rooms, English classes into existing math classrooms, and math classes into the space currently used for wood tech and metal tech labs, and building an addition onto the high school with new 21st century science, tech, engineering, arts and math rooms.
  • 21st Century classroom updates/Infrastructure improvements
  • Renovate high school library & creation of Learning Commons

  • Renovate high school Red Room to a multimedia auditorium

  • Renovate high school Blue Room to a Black Box Theatre

  • Renovate high school to create a student-run satellite store/bank

  • Renovate bathrooms in the worst condition

  • Replace classroom asbestos floor tiles

  • Renovate high school gymnasium

  • Construct new exterior restrooms on end of high school science wing

  • Renovate & expand high school phys. ed. classroom/fitness center

  • Add security doors at high school gym lobby

  • Renovate high school nurse’s office, cabinets

  • Improve classroom electrical access, install more outlets

  • Replace master clock & public address systems

 

Phase 3

O'Rourke Middle School--Anticipated start in summer 2017 with an anticipated completion in fall 2017

  • Improve classroom electrical access, install more outlets
  • 21st Century classroom updates/Infrastructure improvements
  • Renovate first floor science laboratories
  • Renovate second floor science laboratories

 

Stevens Elementary School--Anticipated start in summer 2017 with an anticipated completion in fall 2017

  • Improve classroom electrical access, install more outlets
  • 21st Century classroom updates/Infrastructure improvements
  • Replace classroom asbestos floor tiles
  • Replace classroom door locksets & closers
  • Replace historic gym windows
Return to Referendum homepage